§42-271.
Restoration After Non-Compliance
The Soil Erosion and Sedimentation Control Administrator may require a person who engaged in a land-disturbing
activity and failed to retain sediment generated by the activity, as required by NCGS §113A-57 (3), to restore the
waters and land affected by the failure so as to minimize the detrimental effects of the resulting pollution by
sedimentation. This authority is in addition to any other civil or criminal penalty or injunctive relief authorized
under this subpart.